SmartgridOne logo
SmartgridOne logo
AppCertifikaterController
Eksterne Signaler
Enheder
Elbilopladningsstation
Energimåler
Gasmåler
Kedel
Nye integrationer
Plc
Pv Hybrid- og batteri-invertere
a-TroniXABB, FIMERADS-TecAlphaESSAmpowrAngileAnklous PV, Hybrid og Batteri InvertereAPsystemsAteps Batteri
Autarco
BeauventC-BatteriCellpowerChisageDanfossDeltaDET Power PV, Hybrid og Batteri InvertereDEYEDiehl-AkoDMEGC InvertereDynessDysun EnergyEcosourcenEenovanceElecnovaEnbrilionEnergreenEnerlutionEnjoyPowersEnphaseEP UdstyrESY InvertereEVEFortonaForud for
Foxess
FraxFroniusGoodWeGotionGrønnere / Alfen
Growatt
HiteHithium
Huawei
Hypontech
Hyxipower
iWellJinkoKacoKehuaKostal
Kstar
MarstekMastervoltMidTeQMotomaOctave EnergyOmniPowerPixiiPower-SonicPoweroadPylontechRegitecRenonRenoveringRitarSAJSchneider SunEzySchucoSCUSE2200H til SE6000HSessySigenergySinexcel
Sma
Socomec
Sofar
Solaredge
SolarlogSolarMaxSolarwattSolaxSolinteg
Solis
Solplanet
Sungrow
SunwaytechSunwoda
Sunwoda
Sus-PowerTeclomanTeploreTesvoltVaconVictronVolstoraWattsNextWeihengXantrexZendure SolarFlowZetaraZeversolar
Sky
Vandmåler
Varmepumpe
Vekslende Belastninger
Fejlfinding
InstallationKom godt i gang
Konfiguration fra A til Z
Kontrolresponstid
Kundespecifik
LicensNetværkRetningslinjer for ledningsføring og tilslutningSikkerhed, vedligeholdelse og juridiske meddelelserSpecifikationerStatus-LED'er
Tilbehør
Værktøjskasse
Videovejledninger
EnhederPv Hybrid- og batteri-invertere
logo

Sigenergy Invertere

Understøttede enheder

Device TypeVariantsModbus TCP (Ethernet)RS485Curtailment
SigenStor-✅✅✅
PV Max
Hybrid

Ledningsføring

SmartgridOne Controller og Dyness invertere kommunikerer via RS485 eller Ethernet.

Ethernet

For korrekt ethernet-ledningsføring: Følg .

RS485

Sessy

Previous Page

Sinexcel

Next Page

On this page

Sigenergy InvertereUnderstøttede enhederLedningsføringEthernetRS485Konfiguration
Info
RS485 Wiring
  • For correct RS485 wiring: Follow the guidelines for RS485 wiring.
  • If the wiring shown in the table below is incorrect, please let us know.
  • There is no general consensus in the industry about the usage of A and B for the RS485 polarity, so it may be counterintuitive and opposite of what you might expect for some devices.
DeviceSmartgridOne Controller model OM1SmartgridOne Controller model IG8RS485-USB converterRS485-Ethernet converter
ARS485 ARS485_POSRS485 ATX+
BRS485 BRS485_NEGRS485 BTX-
N/ARS GNDGNDNot availableG

Konfiguration

Sørg for, at modbus er aktiveret:

  1. Fra hovedsiden gå til "Device"
  2. Klik på "Powerhouse Settings"
  3. Aktiver "Modbus TCP Server Enable"
Sigenergy Modbus

Sørg for, at inverteren er sat til Remote EMS Mode:

  1. Fra hovedsiden gå til "System"
  2. Klik på de tre prikker ved siden af installations-namespace
  3. Klik på "System Settings"
  4. Klik på "Operational Mode"
  5. Vælg "Remote EMS Mode"
Sigenergy Mode

Deaktiver eventuelle netbegrænsninger:

  1. Fra hovedsiden gå til "System"
  2. Klik på de tre prikker ved siden af installations-namespace
  3. Klik på "System Settings"
  4. Under "Operational Parameters" deaktiver "Export Limitation" og "Import Limitation"
  5. Sæt "Grid Connection Point Reserve Power Control Method" til "Power Per Phase"
Sigenergy Limits
Advarsel
NOTE: RS485 Device Addresses
  • You MUST give each device on the RS485 bus a unique address. Check the manual of the device on how to do this.
  • Use lower addresses first (1, 2, ...) because the SmartgridOne Controller will find them faster!
  • For each device, it is generally recommended to stick with the factory default baud rate, parity, and stop bits. The SmartgridOne Controller will scan on those first.
retningslinjerne for ethernet-ledninger