The manual describes the steps to set up DNO Relay Control on the SmartgridOne Controller.

When setting up this integration, permission is granted to DNO to control the necessary devices.

Supported Devices

Device TypeVariantsSupported
Solar InvertersAll
Storage Devices
EV Chargers

Supported Countries

CountrySupported
Belgium
Netherlands

Prerequisites

1. Add the batteries and solar inverters

Login to the commissioning interface and make sure the devices are added to the SmartgridOne Controller.

2. Add the Digital Inputs

This external signal operates using digital input devices which are connected to the SmartgridOne Controller. The digital inputs can be connected using DS1242 or other relay modules.

At least TWO digital inputs are required. These are used for battery control. A third digital input can be connected for PV-curtailment.

3. Check the grid power limits

In the settings, the grid power limits should be set correctly. Click Settings and check the highlighted setting in the image. If necessary, adjust the settings.

Add 'DNO- Relay Control'

Image 1
Image 1

In the next page, you have the option to include/exclude devices for remote control. Ensure to mark all checkboxes of devices you'd like to include.

معلومات

When using multiple devices of the same type, they are aggregated into one (virtual) asset.

Image 1

'DNO Relay Control' is now set up on the SmartgridOne Controller.